Flood hazard maps (Cameroon)

Flood hazard mapping for cities in Cameroon CREALP took part in the “Building Capacity for Resilient Urban Development and Integrating Climate and Disaster Risk Considerations into Urban Planning” project managed by the World Bank. The aim of the project was to contribute to increasing the resilience of Cameroon’s cities to the risk of flooding by drawing up hazard maps to enable better planning of urban development, taking into account the risks to… Read More

Water resources management (Peru)

Glaciers + Project > Optimal management of water resources in mountain regions and in a context of climate change, Peru The multi-objective Glaciers+ project(Proyecto Glaciares+) was launched following the Glacier 513 project, which highlighted the potential of optimal water resource management in the Chucchún Valley. The aim of Glaciers+ was to reduce the risks associated with glacier retreat (flooding, block falls, etc.), and to optimize the management of water resources in mountain… Read More

INTERREG Italy-Switzerland cooperation > RESERVAQUA project

Understanding water resources for better management Water resources in the Alps are under increasing pressure: shortages and deteriorating water quality are just some of the consequences of population growth, the impact of various human activities and climate change. The project is supported by the European Regional Development Fund through the INTERREG V-A Italy-Switzerland cooperation program and the Canton of Valais. Its aim is to assess the factors conditioning the distribution of resources… Read More

International cooperation > Flood forecasting (Ecuador)

Development of a hydrological forecasting system in Ecuador CREALP supported INAMHI, the technical-scientific entity responsible for the production and dissemination of hydrometeorological information in Ecuador, in the design of a simulation model and the development of an automatic real-time forecasting system. The support provided consisted of a training course in hydrology using the RS MINERVE software, as well as technical support for the development of a model of the Coca watershed. This… Read More

Water resource management (Jinsha, China)

Jinsha River Basin (JRB): Integrated Water Resources and Risk Management under Changing Climate The aim of the “Jinsha River Basin (JRB): Integrated Water Resources and Risk Management under Changing Climate” project was to develop an integrated water resources and risk management system for the Jinsha river watershed in the context of climate change. The project has multiple aspects, since it aims to use an environmental approach to protect people and property from… Read More

Adapting to climate change (Peru)

Adapting to climate change and reducing the risks associated with glacial retreat in the Andes – Peru The Glacier 513 project was a multi-objective project designed to reduce the risks associated with the retreat of Glacier 513 (Peru), and to optimize water resource management for its entire watershed. Located in the Ancash region of Peru’s Cordillera Blanca, Glacier 513 lies upstream of the Chucchún basin and threatens the city of Carhuaz. In… Read More